Dave Ramsey Endorsed Local Provider for 15+ years

Keller Williams Preferred Realty(612) 843-9620Join HHG

Selling

Selling in Minnesota: what’s required

The disclosures every Minnesota seller owes, and the Twin Cities cities that require a housing or sewer inspection before you can list, show or close.

Minnesota doesn’t have a statewide pre-sale home inspection. Instead, some cities have their own programs, and a few counties require septic inspections. Each listing below comes from the city’s own website, checked October 2026. Rules change, so confirm with the city before you list. We handle this for our sellers as part of every listing.

Cities that require a housing evaluation or inspection

Truth in Sale of Housing, Time of Sale or Point of Sale programs.

Minneapolis

Truth in Sale of Housing (TISH)

Sellers must have a full Truth in Sale of Housing report from a licensed evaluator before the home can be shown.

  • Applies to single-family houses, duplexes, townhouses and first-time condominium conversions.
  • Covers sales by owner or agent, contracts for deed and other title transfers.
  • The evaluation can lead to required repairs, which are then reinspected.
  • Not needed if the city has issued a Certificate of Code Compliance (good for a year) or a Certificate of Occupancy for a new home.

Minneapolis TISH, 612-673-5840 · City of Minneapolis

Saint Paul

Truth-in-Sale of Housing (TISH)

A licensed evaluator’s TISH report is required within three days of listing or advertising a home for sale.

  • Applies to single-family homes, duplexes, condominiums and townhomes; buildings with three or more units are exempt.
  • The report is for disclosure only. For single-family homes, the one required repair is a working hard-wired smoke alarm.
  • A report is valid for 365 days and for one sale.

City of Saint Paul

Bloomington

Time-of-Sale Housing Inspection

A Time-of-Sale evaluation must be completed and filed before the home is listed.

  • Applies to single- and two-family homes, condominiums, townhouses and mobile homes; buildings with four or more units are excluded.
  • The report goes to the city within 7 days of the evaluation.
  • Hazards must be corrected, or assumed by the buyer, and city-inspected. The program includes an energy disclosure (since April 2022).

City of Bloomington

Richfield

Point of Sale Inspection

A city housing inspector must inspect the home before closing.

  • Applies to single-family and two-family homes, including condominiums.
  • The inspection can be done any time during the sale, but must be finished before title transfers. Apply online, then schedule.
  • If the buyer takes on repairs, closing proceeds only under the conditions in the city’s brochure.

Richfield Inspections, 612-861-9882 · City of Richfield

St. Louis Park

Point-of-sale (property maintenance) inspection

Before listing, sellers apply for a property maintenance inspection permit and have the city inspect the home.

  • Applies to residential, commercial and industrial property.
  • Code corrections found in the inspection are usually made by the seller.

Building and Energy, 952-924-2588 · City of St. Louis Park

Maplewood

Truth in Housing

A Truth in Housing evaluation by a city-licensed evaluator is required before listing or showing the home.

  • The evaluation is for disclosure; the sale doesn’t depend on fixing what it lists.

City of Maplewood, 651-249-2300 · City of Maplewood

New Hope

Point of Sale Inspection

A city inspector inspects the home and any required repairs are made before the sale.

  • Applies to all residential sales: single-family homes, condos, townhomes and apartment buildings.
  • The fee covers the inspection and one reinspection.

New Hope Inspections, 763-531-5127 · City of New Hope

Columbia Heights

Time of Sale Program

Sellers need a Certificate of Property Maintenance before selling, gifting or transferring the home.

  • Applies to single-, two- and three-family homes, condominiums, townhouses and mobile homes.

Community Development, 763-706-3670 · City of Columbia Heights

South St. Paul

Time-of-Sale Housing Inspection

A Time-of-Sale evaluation report from a city-licensed evaluator must be available when the home is shown.

  • Applies to single-family, two-family and multiple-family dwellings.
  • Evaluators set their own prices.

City of South St. Paul

Cities that require a sewer (I/I) inspection

Inflow and infiltration programs check the private sewer line, sump pump and roof drains so clear water stays out of the sanitary sewer.

Golden Valley

Inflow and infiltration (I/I) compliance

A home without a Certificate of I/I Compliance must have its sewer inspected before it can be advertised for sale.

  • The city televises the sewer line from the house to the main and checks the sump pump and roof drains for illegal connections.
  • Repairs are due within 180 days (one 180-day extension); if they can’t be done before closing, escrow is required.
  • The certificate stays with the property after the sale.

City of Golden Valley

West St. Paul

Inflow and infiltration (I&I) inspection

A sewer (I&I) inspection must be completed before a property is sold.

  • The city schedules the inspection at no charge: a camera inspection of the sewer and a sump check.
  • A compliance letter is good for 10 years (25 if the whole line was lined or replaced).

City of West St. Paul

Orono

Certificate of I/I Compliance

Properties on city sewer need a Certificate of Inflow and Infiltration Compliance before they’re sold.

  • The inspection looks for roof drains, foundation drains and sump pumps connected to the sanitary sewer.
  • Residential fee: $250. Homes on private septic systems aren’t part of this program.

City of Orono, 952-249-4686 · City of Orono

Mounds View

Sewer lateral inspection (Ordinance 967)

Before title transfers, the sewer line from the house to the main must be televised and, if needed, repaired.

  • Repairs are due within 90 days, and the property can’t transfer until they’re made; closing in escrow is allowed.

City of Mounds View

St. Anthony

Inflow and infiltration (I/I) inspection

Two inspections are required before a property is advertised or sold: a sump pump check and a televised sewer inspection.

  • Individual condominium sales are exempt.
  • A Certificate of I/I Compliance is valid for 3 years (longer after sewer work).
  • The seller fixes violations before the sale unless the buyer takes them on in writing.

City of St. Anthony

Tonka Bay

Inflow and infiltration (I&I) certificate

Sellers must get an I&I certificate before closing, based on a professional video inspection of the sewer line.

  • The homeowner submits a televised scope of the sewer line from the house to the main; the Public Works Superintendent reviews it and approves the certificate.
  • Application fee: $150.

Tonka Bay City Hall, 952-474-7994 · City of Tonka Bay

Newport

Sewer lateral inspection before sale

Homes on city sewer must have the sewer lateral inspected and certified to city standards before the sale or transfer.

  • The inspection is free; apply through West St. Paul’s permit office (651-259-2622), which handles it for Newport.
  • Unpaved or worn-out driveways and parking areas connected to a paved public road must be paved before the sale (City Code 18-73 and 36-161).
  • Call City Hall at least two business days before closing for a final water meter reading ($25).

Newport City Hall, 651-459-5677 · City of Newport

No longer required: Hopkins (The requirement was repealed effective January 14, 2021.); Robbinsdale (The city repealed it by Ordinance 24-02 in 2024.)

Not listed? That city’s requirement wasn’t on our confirmed list. Ask us or the city’s inspections department before you list.

What every Minnesota seller owes

Seller’s disclosure

Sellers must disclose material facts they know about that could significantly affect the buyer’s use or enjoyment of the property, using a written disclosure or an inspection report, or both sides can agree in writing to waive it.

Minn. Stat. 513.52–513.60

Wells

Before signing a purchase agreement, the seller must disclose in writing whether there are any wells on the property and their status; a well disclosure certificate is filed with the deed.

Minn. Stat. 103I.235

Septic systems

Sellers must disclose whether the home has a septic (subsurface sewage treatment) system and where it is. Many counties also require a compliance inspection before the sale, for example Dakota County.

Minn. Stat. 115.55, subd. 6

Radon

Before the purchase agreement, sellers must disclose what they know about radon testing, levels and any mitigation system, include the state’s radon warning statement and give the buyer the Minnesota Department of Health publication “Radon in Real Estate Transactions.”

Minn. Stat. 144.496

Lead-based paint

For homes built before 1978, federal law requires a lead-based paint disclosure and pamphlet, and gives buyers a chance to test.

42 U.S.C. 4852d

Methamphetamine production

Sellers must disclose in writing if they know methamphetamine was produced on the property.

Minn. Stat. 152.0275

Condos and townhomes

In most common-interest communities, the seller provides the association’s resale disclosure information. Unless the buyer had it more than 10 days before signing, the buyer can cancel within 10 days of receiving it.

Minn. Stat. 515B.4-107 and 515B.4-108

Deed tax

A state deed tax of 0.33% of the sale price (plus 0.01% in Hennepin and Ramsey counties) is due when the deed is recorded; sellers usually pay it.

Minnesota Department of Revenue

This is general information, not legal advice. Your purchase agreement, title company and attorney have the final word.

Common questions

Do I need a city inspection to sell my house in Minnesota?

Only in some cities. Minnesota has no statewide pre-sale inspection, but 9 Twin Cities cities we confirmed require a housing evaluation or inspection (including Minneapolis, Saint Paul, Bloomington and Richfield), and 7 more require a sewer inspection before a sale.

What is a Truth in Sale of Housing (TISH) report?

A city-required evaluation of a home’s condition by a licensed evaluator, done before the home is marketed. Minneapolis and Saint Paul call it Truth in Sale of Housing; other cities call it Time of Sale or Point of Sale. Some programs are disclosure only; others require repairs.

What is an I/I or sewer inspection at sale?

Some cities require the sewer line from the house to the street to be camera-inspected, and sump pumps and roof drains checked, before a sale, to keep clear water out of the sanitary sewer. Golden Valley, West St. Paul, Orono, Mounds View, St. Anthony, Tonka Bay and Newport are examples.

What do all Minnesota sellers have to disclose?

Known material facts about the property (or an agreed waiver), any wells, any septic system, radon information, lead-based paint for homes built before 1978, and any known methamphetamine production.

Next: Estimate your net proceeds · Sell with us · Selling a longtime home

Save this home

We’ll keep your saved homes together and let you know if the price changes. No spam.